Begin Main Content Area

‚ÄčLincoln Way over Long Run Project

2031_Map.png

Project Overview

The proposed project scope of work consists of the replacement of the existing bridge with a precast concrete box culvert (or single-span bridge). In addition, roadway approach work will include lengthening the left and right turn lanes approaching the intersection of S.R. 48, traffic signal adjustments, drainage, guide rail, signing, pavement markings, and other miscellaneous work.

Construction for this project is slated to begin in the summer/fall of 2023.