Begin Main Content Area

Route 48 over Jacks Run Project

Route48_Map.png

​Project Overview

The proposed project scope of work consists of replacement of the existing reinforced concrete slab bridge with a precast concrete box culvert, along with minimal roadway approach work, minor drainage, guide rail, pavement markings and other miscellaneous work.

Construction for this project is slated to begin in the summer / fall of 2023. 

Project Presentation

Please select the image below to view a PDF of the project presentation. 

Route48_Presentation.PNG