The Pennsylvania Department of Transportation (PennDOT) invites the public to an online plan display regarding the SR 0030 (Lincoln Highway) intersection safety improvements and resurfacing project.  This project is located from SR 0896 to SR 0772 in East Lampeter, Leacock, Paradise, and Salisbury Townships for a total distance of approximately 9.1 miles.  

The purpose of this project is to improve turning movements, signing, pavement markings, and traffic signalization to provide for continued safe movement along the corridor as well as to preserve and extend the life of the existing pavement along SR 0030 (Lincoln Highway).

The project consists of a select intersection improvements and resurfacing along SR 0030 (Lincoln Highway).  Corridor-wide improvements will include resurfacing as well as signing, pavement marking, guide rail, storm drain, and ADA curb ramp upgrades.  Select intersection improvements will include the following:


  • SR 0030 at SR 0896 – Installation of new decorative stamped asphalt crosswalks and reconstruction of the existing traffic signal with decorative mast arm poles.
  • SR 0030 at Ronks Road – Installation of new advance signal ahead flashing warning device along eastbound SR 0030 and upgrades to existing ADA curb ramps.
  • SR 0030 at Singer Avenue – Pavement widening in the northwest, southwest, and southeast quadrants, installation of a new traffic signal with advance signal ahead flashing warning devices in both directions along SR 0030, and installation of ADA curb ramps.
  • SR 0030 at Belmont Road – Pavement widening in the northwest and southeast quadrants, reconstruction of the existing traffic signal with new advance signal ahead flashing warning devices in both directions along SR 0030, and installation of ADA curb ramps.
  • SR 0030 at Vintage Road – Removal of existing pavement and new pavement widening in the southeast quadrant and installation of new plain cement concrete curb and storm drain system (inlet and pipe) in the northwest quadrant.
  • SR 0030 at N. Kinzer Road – Construction of a new connector road between SR 0030 and N. Kinzer Road (N. Kinzer Road Connector), removal of the existing N. Kinzer Road access to SR 0030, construction of a new cul-de-sac along N. Kinzer Road, and installation of new plain cement concrete curb.
  • SR 0030 at Brackbill Road – Installation of new advance signal ahead flashing warning devices in both directions along SR 0030 and upgrades to existing ADA curb ramps.
  • SR 0030 at SR 0772 – Installation of new advance signal ahead flashing warning devices in both directions along SR 0030.

The project is currently in design, and construction work is anticipated to take 20 months beginning in the 2023 construction season.

In accordance with Governor Wolf's COVID-19 mitigation efforts, a plans display will be held online only. A digital version of the information will be available to view online from December 20, 2021, to January 31, 2022.