Begin Main Content Area

Drainage Authoring


For this phase of the directive, we are piloting the process of developing model-based deliverables for construction contracts using the OpenRoads Designer software, which includes analysis, 3D modeling and detailing tools. The objectives of this project are to develop a 3D model as complete as possible to reproduce the content traditionally conveyed through contract and also plans, including roadways, drainage systems and utilities, and structures. Project construction inspection staff will use the model in lieu of plan sheets and cross section sheets.

Selected Pilot Projects:

​Project
District
County​
SR-Section​​Description
​Anticipated Let Date
109873
2
McKean
0346-538
SR 346/4009 Signals/Roadway Improvements
10/24/2024
92949
4
​Lackawanna
​8002-290
​Tigue Street Park N Ride
06/06/2024
96302
​8
​Dauphin
​3026-009
​Elmerton Avenue Resurface
03/26/2026
108173
​9
​Cambria
​3007-006
​SR 3007 - T-377 to PA 56
08/22/2024
105900
10
Butler
0228-204
Ekastown West 3R
10/24/2024
101165
​11
​Beaver
​0018-B61
​Frankfort Road Bridge
08/22/2024