Adams | 8 | Straban Township | $26,034 | LED upgrades along the Route 30 Corridor. |
Allegheny | 11 | Bethel Park | $57,995 | Pedestrian and vehicle LED replacement along State Route 88 at Corrigan Drive and traffic signal retiming along Bethel Church Road at Highland Avenue. |
Allegheny | 11 | Bridgeville | $213,282 | Installation of adaptive traffic signal equipment and software along Washington Avenue at Station Street, Bower Hill Road, and Prestley Road. |
Allegheny | 11 | East Deer Township | $83,200 | LED upgrades along Freeport Road at Third Street. |
Allegheny | 11 | Greentree | $243,360 | Upgrading the overhead lane control systems to LED along Greentree Road. |
Allegheny | 11 | Monroeville | $198,370 | Traffic signal replacement along Northern Pike at Patty Lane |
Allegheny | 11 | Moon Township | $296,206 | Traffic signal improvements along University Boulevard. |
Allegheny | 11 | Mt. Lebanon Township | $152,489 | Intersection improvements along Castle Shannon Boulevard at Anawanda Street. |
Allegheny | 11 | Mt. Lebanon Township | $363,520 | Traffic signal upgrades at 30 intersections within Mt. Lebanon Township. |
Allegheny | 11 | Mt. Lebanon Township | $178,760 | Intersection improvements along Cedar Boulevard at Greenhurst Drive. |
Allegheny | 11 | Mt. Lebanon Township | $231,032 | Intersection improvements along Bower Hill Road at Kelso Road. |
Allegheny | 11 | South Fayette Township | $77,484 | Installation of adaptive traffic signal equipment and software along Washington Pike at Bursca Drive and at Twin Ponds Lane. |
Allegheny | 11 | Springdale | $173,064 | Traffic signal replacement along Pittsburgh Street at Colfax Street. |
Allegheny | 11 | Upper St. Clair Township | $461,289 | Traffic signal upgrades along McMurray Road at Johnson Road and along McLaughlin Run Road at U.S. Route 19 Southbound Ramps. |
Berks | 5 | Fleetwood | $132,000 | Traffic signal upgrades along Franklin Street at Main Street. |
Berks | 5 | Reading | $148,000 | Removal of the unwarranted traffic signal along Sixth Street at Laurel Street. |
Berks | 5 | St. Lawrence | $251,107 | Traffic signal upgrades along St. Lawrence Avenue and Perkiomen Avenue corridors. |
Berks | 5 | West Reading | $134,536 | LED replacement along Penn Avenue at Fourth, Fifth, Sixth, and Seventh avenues. |
Berks | 5 | Wyomissing | $233,561 | LED replacement along Penn Avenue, State Hill Road, Park Road, and Paper Mill Road corridors. |
Bucks | 6 | Bensalem Township | $501,102 | Installation of adaptive traffic signal equipment and software along the Hulmeville Road Corridor from Street Road to Bristol Road. |
Bucks | 6 | Bristol Township | $252,184 | Traffic signal modernization along State Road at Cedar Avenue. |
Bucks | 6 | Bristol Township | $191,255 | Traffic signal modernization along Radcliffe Street at Randall Avenue. |
Bucks | 6 | Bristol Township | $226,194 | Traffic signal modernization along Mill Creek Parkway at Haines Road. |
Bucks | 6 | Upper Southampton Township | $1,079,069 | Installation of adaptive traffic signal equipment and software along the Second Street Pike Corridor. |
Bucks | 6 | Yardley | $212,960 | Intersection improvements along Main Street at Afton Avenue. |
Butler | 10 | Connoquenessing Township | $160,000 | Traffic signal upgrades along State Route 68 at Kriess Road and Eagle Mill Road. |
Butler | 10 | Cranberry Township | $138,240 | Installation of adaptive traffic signal equipment and software along the State Route 19 Corridor. |
Butler | 10 | Cranberry Township | $612,050 | Traffic signal upgrade along State Route 19 at St. Francis Way. |
Centre | 2 | College Township | $200,083 | Installation of pedestrian signals and upgrades along East College Avenue at Elmwood Street. |
Centre | 2 | Ferguson Township | $80,000 | Vehicle detection upgrades along West College Avenue at Bristol Avenue and Whitehall Road, along Blue Course Drive at Old Gatesburg Road, and along Whitehall Road at Research Drive. |
Centre | 2 | Patton Township | $198,082 | Installation of adaptive traffic signal equipment and software along the Valley Vista Drive Corridor. |
Centre | 2 | Spring Township | $31,279 | Signal equipment repalcement along East College Avenue at Harrison Road and Main Street. |
Chester | 6 | East Vincent Township | $263,799 | Intersection improvements along Schuylkill Road at New Street. |
Chester | 6 | Phoenixville | $31,420 | LED replacement along Church Street at Gay Street and Main Street, along Franklin Street at High Street, and along Washington Avenue at Gay Street. |
Chester | 6 | Uwchlan Township | $53,829 | Installation of battery back-up system along Dorlan Mill Road at Moore Road. |
Chester | 6 | Westtown Township | $180,000 | Study and removal of the unwarranted traffic signal along West Chester Pike at Chester Road. |
Crawford | 1 | Meadville | $798,341 | Traffic signal replacement along Water Street at Chestnut, Center and Arch streets. |
Cumberland | 8 | North Middleton Township | $219,462 | Traffic signal modernization along Spring Road at Cavalry Road. |
Cumberland | 8 | Silver Spring Township | $45,273 | Auxiliary cabinet and controller upgrades along the Route 11 Corridor. |
Cumberland | 8 | South Middleton Township | $62,574 | Installation of emergency pre-emption along the Walnut Bottom Road Corridor. |
Cumberland | 8 | South Middleton Township | $44,696 | Installation of emergency pre-emption along the York Road Corridor. |
Cumberland | 8 | South Middleton Township | $13,680 | Traffic signal retiming along the Walnut Bottom Road Corridor. |
Dauphin | 8 | Harrisburg | $357,150 | Traffic signal upgrades and signal performance along the Forester Street Corridor. |
Delaware | 6 | Concord Township | $144,000 | Installation of battery back-up systems along Baltimore Pike, Wilmington Pike, Naamans Creek Road, Conchester Highway, and Smithbridge Road corridors. |
Delaware | 6 | Concord Township | $56,000 | Installation of adaptive traffic signal equipment and software along the Balitmore Pike at Concord Road. |
Delaware | 6 | Marple Township | $440,000 | Traffic signal improvements along the Sproul Road Corridor. |
Delaware | 6 | Middletown Township | $108,000 | Implementation of low-cost safety improvements along New Middletown Road at Glen Riddle Road and along Edgmont Avenue at Knowlton Road. |
Delaware | 6 | Springfield Township | $284,000 | Traffic signal improvements along the Sproul Road Corridor. |
Erie | 1 | Erie | $244,505 | Traffic signal replacement and installation of pedestrian signals along Sixth Street at Bacon Street. |
Erie | 1 | Summit Township | $43,584 | Traffic signal improvements along Peach Street and Douglas Parkway Corridors. |
Fayette | 12 | Connellsville | $53,075 | Traffic signal equipment upgrades along Pittsburgh Street at Fairview Avenue and Apple Street, along Crawford Avenue at Arch Street and Pittsburgh Street, and along Snyder Street at Fairview Avenue. |
Franklin | 8 | Fannett Township | $57,840 | Installation of solar-powered flashing warning devices along Path Valley Road at Spring Run Road. |
Franklin | 8 | Greencastle Borough | $43,677 | Installation of rectangular rapid flashing beacon system along Baltimore Pike at Linden Avenue and along Baltimore Pike at Allison Street. |
Indiana | 10 | White Township | $172,545 | Traffic signal ugprades along Ben Franklin Road at Warren Road. |
Lackawanna | 4 | Clarks Green Borough | $39,755 | Traffic signal equipment upgrades along East Grove Street at South Abington Road. |
Lackawanna | 4 | Scranton | $135,200 | Traffic signal replacement along Green Ridge Street at Wyoming Avenue. |
Lancaster | 8 | East Donegal Township | $147,200 | Intersection safety upgrades along River Road at Mount Joy Road. |
Lancaster | 8 | East Lampeter Township | $54,400 | Traffic signal equipment upgrades along the Old Philadelphia Pike, Greenfield Road, and Witmer Road corridors. |
Lancaster | 8 | East Lampeter Township | $44,000 | Traffic signal improvements along Lincoln Highway at Strasburg Pike. |
Lancaster | 8 | East Lampeter Township | $44,000 | Traffic signal improvements along Old Philadelphia Pike at Horseshoe Road. |
Lancaster | 8 | Elizabethtown Borough | $18,000 | Traffic signal upgrades along the Market Street Corridor. |
Lancaster | 8 | Ephrata Borough | $113,278 | Traffic signal detection upgrades along South Reading Road at Meadow Valley Road and at South Academy Drive. |
Lancaster | 8 | Lancaster | $1,401,714 | Traffic signal controller upgrades at 91 intersections through the City of Lancaster. |
Lancaster | 8 | Lititz Borough | $64,800 | Pedestrian signal ugprades alogn the Broad Street and Main Street corridors. |
Lancaster | 8 | Manheim Borough | $72,000 | Installation of battery back-up systems along the Main Street Corridor. |
Lancaster | 8 | Warwick Township | $127,600 | Traffic signal detection system upgrades along Rothsville Road at Newport Road and along Main Street at Church Street and Rothsville Road. |
Lancaster | 8 | West Hempfield Township | $13,269 | Installation of battery back-up and pre-emption along Stony Battery Road at Route 30 Eastbound Ramp and Rotue 30 Westbound Ramp. |
Lehigh | 5 | Allentown | $775,378 | Traffic signal coordination along the Lehigh Street Corridor. |
Luzerne | 4 | Hanover Township | $96,528 | Traffic signal upgrades along Sans Souci Parkway at St. Mary's Road and Willow Street. |
Luzerne | 4 | Plains Township | $61,848 | LED signal replacement along River Street at Maffett Street, along Carey Avenue at Main Street, and alon gRoute 315 at Laird Street. |
Lycoming | 3 | Loyalsock Township | $129,500 | Traffic signal replacement along Northway Road at Sheridan Street. |
Mckean | 2 | Foster Township | $62,500 | Traffic signal replacement along Main Street at Bolivar Drive. |
Mercer | 1 | Greenville Borough | $188,200 | Traffic signal replacement along Main Street (SR 0018) at Prairie Street. |
Mercer | 1 | West Middlesex Borough | $42,160 | Detection system upgrade along New Castle Road at Main Street. |
Montgomery | 6 | Abington Township | $298,480 | Traffic signal upgrades along Fitzwatertown Road at North Hills Avenue. |
Montgomery | 6 | East Norriton Township | $329,750 | Installation of adaptive traffic signal equipment and software along the Germantown Pike Corridor. |
Montgomery | 6 | East Norriton Township | $108,300 | Installation of video detection system along the Germantown Pike Corridor. |
Montgomery | 6 | Hatboro Borough | $1,330,508 | Traffic signal equipment ugprades along Montgomer Avenue at Jacksonville Road. |
Montgomery | 6 | Jenkintown Borough | $89,784 | Traffic signal equipment upgrades and LED replacement at eight intersections along the York Road Corridor. |
Montgomery | 6 | Lower Frederick Township | $1,474 | LED replacement along the Route 29 Corridor. |
Montgomery | 6 | Lower Moreland Township | $148,080 | Traffic signal equipment and safety upgrades along Byberry Road at Pine Road. |
Montgomery | 6 | Lower Salford Township | $54,200 | Preventative maintenance at 13 intersections throughout Lower Salford Township. |
Montgomery | 6 | Upper Dublin Township | $2,200,000 | Installation of adaptive traffic signal equipment and software along the West Moreland Road and Easton Road Corridors. |
Montgomery | 6 | Upper Merion Township | $107,968 | LED replacement at 24 intersections along the Dekalb Pike, Gulph Road, Henderson Road, Valley Forge Road, and Swedesford Road corridors. |
Montgomery | 6 | Upper Pottsgrove Township | $21,186 | Installation of emergency pre-emption systems along Pottstown Pike at State Street and Moyer Road. |
Montgomery | 6 | Upper Providence Township | $239,230 | Installation of adaptive traffic signal equipment along the Egypt Road Corridor. |
Montgomery | 6 | Whitpain Township | $79,578 | Traffic signal equipment upgrades at the itnersection of Skippack Pike and Pennlyn-Blue Bell Pike. |
Montgomery | 6 | Worcester Township | $141,700 | Traffic signal equipment upgrades along Valley Forge Road at Skippack Pike and Township Line Road. |
Montgomery | 6 | Worcester Township | $80,240 | Fiberoptic traffic signal interconnection along Germantown Pike at Park Avenue and Trooper Road. |
Montour | 3 | Danville Borough | $55,440 | Traffic signal retiming and synchronization at 10 intersections along Walnut Street, Mill Street, and Northumberland Road Corridor. |
Northampton | 5 | Tatamy Borough | $10,008 | Installation of emergency pre-emption systems along Eighth Street at Main Street and Commerce Lane. |
Northumberland | 3 | Sunbury | $354,332 | Traffic signal equipment upgrades at the intersection of Fourth Street and Arch Street. |
Philadelphia | 6 | Philadelphia | $2,800,000 | Traffic signal modernization at 12 intersections along the Castor Avenue Corridor. |
Philadelphia | 6 | Philadelphia | $7,100,000 | Traffic signal modernization and equipment upgrades at 24 intersections along the Cheltenham Avenue Corridor. |
Schuylkill | 5 | Cass Township | $133,544 | Traffic signal equipment upgrades along Highridge Park Road at Keystone Boulevard and at the I-81 Northbound Ramps. |
Schuylkill | 5 | Foster Township | $48,088 | Traffic signal equipment upgrades along State Route 901 at Keystone Boulevard. |
Schuylkill | 5 | Minersville Borough | $181,920 | Traffic signal retiming and coordination at eight intersections along the Sunbury Street Corridor. |
Schuylkill | 5 | Minersville Borough | $308,270 | Pedestrian improvements and installation or overspeed warning system at eight intersections along the Sunbury Street Corridor. |
Schuylkill | 5 | Pottsville | $314,313 | Traffic signal and intersection upgrades at the intersection of Market Street and 20th Street. |
Schuylkill | 5 | Saint Clair Borough | $229,600 | Traffic signal equipment upgrades along Claude Lord Boulevard at Hancock Street, Russell Street, Terry Rich Boulevard, and Ann Street. |
Union | 3 | Mifflinburg Borough | $53,331 | Traffic signal retiming along Chestnut Street at Third Street and Fourth Street. |
Union | 3 | Union County | $53,331 | Traffic signal equipment upgrades at the intersection of East Chestnut Street at Mabel Street. |
Washington | 12 | Cecil Township | $416,850 | Traffic signal system upgrades at seven intersections along the Southpointe Boulevard Corridor. |
Washington | 12 | Peters Township | $382,950 | Traffic signal equipment upgradesa t the intersection of McMurray Road at Valleybrook Road. |
Westmoreland | 12 | Washington Township | $16,000 | Township traffic signal activities. |
York | 8 | Dillsburg Borough | $44,620 | LED replacement at seven intersections along the State Route 15 Corridor. |
York | 8 | Wrightsville Borough | $37,054 | Traffic signal equipment upgrades along Hellam Street at Ninth Street and Sixth Street. |
York | 8 | York Township | $182,035 | Traffic signal modernization along Queen Street at Country Club Road. |